Pot Hole Repair MBNA Chester

Back to portfolios

We were contracted by Steadberry at MBNA Chester to repair pot holes in the car park area. This had been a problem for several years being constantly repaired due to heavy vehicles and with the car park being in constant use they needed minimum disruption.

Using our innovative pot hole repair system MMA technology HAPAS approved we repaired 300 pot holes. The works were completed within one week no heavy machinery or plant needed, cold applied resin was used no jointing, long life span zero erosion index and anti slip, minimum disruption the areas were back in use immediately.

Iron works are completely sealed with no water ingress and long life span.